Case Study 14

Foam Lined Pond With Window Recess

This pond is of a traditional block built construction and had been built leaving a space for a pond window to be installed.

We were able to apply all the polyurethane foam lining boards in less than a day and leave to dry before starting on the fibreglass the following morning.

With the PU boards applied we had a smooth and dry surface to work with which allowed the efficient application of the final fibreglass and British Racing Green coloured topcoat.

 

   Home Koi ponds Commercial FAQs Foam Lining Case Studies Videos Testimonials Advice Contact
© 1994 - 2007 GRP Lining Services Ltd. :: Website Management by Chaos Internet