Case Study 14
Foam Lined Pond With Window Recess
This pond is of a traditional block built construction and had been built leaving a space for a pond window to be installed.
We were able to apply all the polyurethane foam lining boards in less than a day and leave to dry before starting on the
fibreglass the following morning.
With the PU boards applied we had a smooth and dry surface to work with which allowed the efficient application of the final fibreglass and British Racing Green coloured topcoat. |